Land & Site 17 Nov 2026 ~9 min read

Slope classes for solar: what Class III land means for your project, and why peat, limestone and ex-mining land count too

Peninsular Malaysia's four hillside slope classes decide whether you need an EIA, how much your specialist reports must prove, and whether a state committee sees your application. The angle bands, the geology that pushes peat, swamp and ex-mining land into Class III, and how to read your own site.

Read the analysis →
Project Finance 22 Aug 2026 ~10 min read

CRESS bankability: the questions your lender will ask — and the SMP mechanics behind them

The standard SAC is cheaper and fixed to the end of 2027, and the new CRESS Acceleration Package fixes the developer's share at 14 sen/kWh for 10 years — so the question moves to the bank. Offtaker credit, merchant tails, the firm/non-firm decision, who carries the green consumer's separate charge and the 2028 reset, and why the System Marginal Price sits under every open position in a CRESS deal.

Read the analysis →
Tax & Incentives 13 Aug 2026 ~9 min read

GITA in 2026: the timing traps that kill solar tax claims — and the fix for each one

Most failed GITA claims never failed on eligibility — they failed on sequencing. The six traps we keep seeing (wrong agency, late paperwork, non-MyHIJAU equipment, tax capacity, the PPA paradox, and the 31 December 2026 deadline that still applies to standalone solar after Budget 2027), each with its fix.

Read the analysis →
Scheme History 13 Aug 2026 ~10 min read

LSS1 to LSS6: what a decade of Large Scale Solar tells you about bidding to win

Round sizes up more than seven-fold, tariffs down four-fold, clearing prices gone dark, and battery storage now required in the main packages. The full round-by-round comparison from LSS1's proof of concept to LSS6's hybrid era — and the lessons that survive every cycle.

Read the analysis →
Scheme Strategy 2026 ~9 min read

Solar ATAP vs SELCO vs CRESS vs Corporate PPA: which solar route fits your factory in 2026?

NEM and CGPP are gone; the December 2025 rule changes moved the numbers by millions of ringgit over a 20-year horizon. A 2026 decision tree comparing Malaysia's four commercial solar routes — with the actual regulatory parameters, including the revised 1 MWac BESS threshold and the cut CRESS System Access Charge.

Read the analysis →

More insights in progress — RP4 tariff mechanics. Check back soon.